Warning: Undefined array key "site" in /www/wwwroot/goods.9u.cl/app/Views/partials/header.php on line 65

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /www/wwwroot/goods.9u.cl/app/Views/partials/header.php on line 65

Warning: Undefined array key 1 in /www/wwwroot/goods.9u.cl/app/Views/partials/header.php on line 66

Deprecated: strtoupper(): Passing null to parameter #1 ($string) of type string is deprecated in /www/wwwroot/goods.9u.cl/app/Views/partials/header.php on line 66
Flowline Suspension Rope Length 152.5 cm (60") when fully stretched
PLACID ARM Payload 5-20 kg / 11- 44 lb
Flowline Top Bar Length 560mm
Custom Bundle No
MPN FLCM-FLN-MSTR-PLA-01
PLACID ARM Height 205mm
Packing Dimensions (LxWxH) 42 x 20.5 x 12cm
Flowline Folded Height 60 cm (23.6")
PLACID ARM Weight 1.80 kg / 3.96 lb
Flowline Waist Hip Strap Minimum Length 81 cm (32 inches)
Packing Weight 2.40 kg / 5.28 lb
Manufacturer Warranty 1 Year
Flowline Top Bar Rotation 180°
Features MAKES YOUR BACK COMFORTABLE & YOUR SHOTS MORE STABLE, MOST VERSATILE CAMERA SUPPORT RIG, THE INVESTMENT THAT LASTS
Head Type Camera Head
PLACID ARM Width 395mm
Compatible Brand For Canon, For Sony
Material Aluminum, Carbon Steel, Stainless Steel
PLACID ARM Depth 65mm
PLACID ARM Construction Aluminum, Carbon Steel, Stainless Steel, EPDM rubber
To Fit CAMERA SUPPORT RIG, Camcorder, Camera, Gimbal
Flowline Waist Hip Strap Maximum 125 cm (49 inches)
Brand FlyCam
Type Flowline Master for Camera & Gimbals
Maximum Load 4-12kg / 9-27lb
Model FLCM-FLN-MSTR-PLA-01
Country/Region of Manufacture India
Flowline Weight Complete 3.6 kg / 8 lb
Flowline Mounted Height 100 cm (39.4")
UPC 717995413684

Check the listing for details. Flycam Flowline Master for Camera & Gimbals with Placid Stabilizing Arm. Condition: New. Listed at 1302.00 USD. Flycam understands the pain of Film-makers & brings you the most iconic combination of Flycam Flowline Master with Placid Arm. The Flycam Flowline adjusts to balance the load placed on the Support Rope by turning the knob present on the rig's back.

$651.00
$1,302.00