| Item Dimensions L X W X Thickness | 1.46"l X 1.46"w X 0.33"th |
|---|---|
| Battery Serviceability | Replaceable |
| Compatible Devices | Ios Devices |
| Unit Count | 4 Count |
| Control Method | App |
| Color | Black |
| MPN | Details_In_Description |
| Material | Plastic |
| Number Of Batteries | 1 Lithium Ion Batteries Required. (included) |
| Range | 50 Meters |
| Product Dimensions | 1.46"l X 1.46"w X 0.33"th |
| Battery Average Life | 12 |
| Brand | Unbranded |
| Marke | Unbranded |
| Antenna Location | Keys Finder, Luggage Tracker Tags, Smart Tracker Tags, Tiles |
| Audible Noise | 92 Db |
| Enclosure Material | Plastic |
| Connectivity Technology | Bluetooth |
Check the listing for details. Waterproof Tracker Tags - Real-Time Location & Loud Beep Alert, 4 Count. Color: Black, Condition: New. Listed at 18.99 USD. The user-replaceable battery lasts up to 12 and alerts you when it needs replacing. Give the gift of security and convenience to yourself or your loved ones. Rest assured that your data is protected with end-to-end encryption.